This 29 plot development in Kent is nearing completion. Our 5 acre manufacturing site with Direct access to the A1 near Sandy in Bedforshire is ideal, not only in its location to supply large areas of the country, but is also superbly equipped to manufacture all elements of timber frame. All Trusses are manufactured on site, as are our easi-joists flooring systems. These can be supplied loose of can be manufactured into floor decks. We stock large quantities of I beam that can also be manufactured into floor decks or again supplied loose. Our Timber frame panels are all hand made in our factory by local employees with many years of experience.
It was with ease that we worked with this Kent based developer to ensure timed deliveries, a fantastic quality product and a kits fully manufactured in our plant.
What an amazing opportunity we were given to provide a design solution to an existing steel Frame at Bedford Rugby club.
Bartram Timber Frame were heavily involved in the design process to ensure that all of Bedford Rugby Clubs criteria were met. We provided design solution for a stepped terrace giving the Rugby club a useable multi-functional space that is regularly used for corporate events and can be hired from the rugby club for private social functions.
Not only did we design the Building, we manufactured the Timber frame on our 5 acre site, ideally located just a few miles from the Rugby club. All in all a very exciting project delivered on time drawing on many areas of our expertise.
We were extremely pleased to be approached to build the new Changing rooms, gym and office facility at Cambridge Rugby club. The project was a pleasure from start to finish. It was clear their current changing facilities were beyond saving !!
Our designers worked with the Rugby club to achieve all the elements that they required ensuring every square inch was usable floor space. The Trusses were manufactured in our Beeston plant and the timber cladding applied to the exterior was also supplied by Bartram’s all from out 5 acre production facility.
The installation process was completed by our experienced fitters, ensuring a seamless design, supply and installation process delivered locally from our plant just a few miles from the Rugby club.
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. AcceptReject
Privacy & Cookies Policy
Privacy Overview
This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.